Acknowledgments /Milestones

  • Execution of the Yara left turn works, with an approximate investment of USD 187,000 and the installation of concrete blocks in the median between Poschiquito and the Spanish Lagoon Bridge.
  • Contribution to the generation of social welfare and environmental care, participation in initiatives such as: Back to School, the Druif beach cleanup day and the Cycling Race May.

Construction of a second roadway between Reina Beatriz Airport and PosChiquito, with three roundabout-type intersections, the construction of a bridge over the Mahuma stream and the construction of an upper arch bridge over Laguna Española. In the PosChiquito sector, a rambla will be built and secondary roads will be rehabilitated in the San Nicolas, Savaneta, PosGrande and PosChiquito sectors.

LOCATION

Aruba

LENGTH

267.54 kilometers

The Project

Aruba

Investment
$ 0 B
of two-lane highway